The Next Generation Open Compute Hardware: Tried and Tested
Benchmark Configuration: Leopard Under Stress
To evaluate how the Leopard platform performs, we put it against two Haswell-powered alternatives: Intel's Decathlete reference platform, and a Dell R730. Please note that we did not have a power supply similar to the Dell R730 in-house, and PSUs with comparable efficiency failed to keep the 12V rail high enough, so the PSU of a Freedom node was used. Normally Leopard is powered by a power shelf with better efficiency, so power usage should be lower when deployed in a complete OR setup as compared to ours.

Leopard coupled to Freedom PSU
To test the servers with a workload similar to what is being run at Facebook, we selected the following benchmarks:
- OLAP: a database workload built by a news aggregator website, putting stress on most of the system (CPU, RAM and disk)
- ElasticSearch: search queries on an index of Wikipedia, a CPU and memory intensive workload
| System | Intel CPU | RAM | Disk | PSU |
| FB Leopard | E5-2670 v3 @ 2.30GHz | Samsung 256 GB DDR4 2133MHz LRDIMM M386A4G40DM0-CPB | Intel SSD DC S3500 240GB | PowerOne SPAFCBK-01G |
| Dell R730 | E5-2670 v3 @ 2.30GHz | Samsung 265 GB DDR4 2133MHz LRDIMM M386A4G40DM0-CPB | Intel SSD DC S3500 240GB | Dell D495E-S1 495W 80Plus Platinum |
| Intel Decathlete v2 | E5-2670 v3 @ 2.30GHz | Samsung 265 GB DDR4 2133MHz LRDIMM M386A4G40DM0-CPB | Intel SSD DC S3500 240GB | Intel S1100ADU00 1100W 80Plus Platinum |
All tests were executed over a 10GbE connection.
Originally published at https://www.anandtech.com/show/9138/open-compute-hardware-tried-and-tested (Wayback Machine).