AMD Opteron Coverage - Part 3: The First Servers Arrive
- Posted in
- IT Computing
Newisys System Management in Use
The SP is controlled on the server via a set of buttons at the front of the chassis:

The controls pictured above allow you to navigate through the service menus displayed on the front-panel LCD. Your first task is to assign the SP's NIC an IP address:



You can also turn on the server, reboot or shut down the OS from this menu:

Originally published at https://www.anandtech.com/show/1100 (Wayback Machine).